Roussos G Dimitrakopoulos

Knowledge Mobilization

Prof. Dimitrakopoulos has conducted over 60 professional development short courses internationally (Australia, North America, South America, Europe, the Middle East, Japan, and South Africa), including Universities (UT Clausthal, University of Toronto, University of Tokyo, University of Athens, University of Witwatersrand, University of Chile, Ecole des Mines de Paris) and, on a regular basis, for professional mining organizations such as the Society for Mining Engineering Metallurgy and Exploration (SME), Canadian Institute of Mining, Metallurgy and Petroleum (CIM) and the Australasian Institute of Mining (AusIMM).

New
McGill Certification Program in “Ore Reserve Risk and Mine Planning Optimization: - CENG 222, 16 Continuing Education Units.

Offered in 2008 and 2010, this Certification program is used to transfers new methods, technologies and approaches my research efforts have produced over the last decade to mining engineering professionals. In 2010, it is attended by 15 participants (3 remote) from Colombia, Mexico, Brazil, Angola, South Africa, Australia, Canada, and the US. For 2008, please see CCE, VOL 02, NO 02, the Bridge, fall 2008.

Recent short courses attract an average of 22 participants, are usually three days long (24 hours of contact) and include computer workshops.

Past Events

  1. Dimitrakopoulos R (2011) Ore reserve risk and mine planning optimization: Stochastic models and optimization for the mining industry. BHP Billiton Base Metals, Santiago, Chile, June 13-17.

  2. Dimitrakopoulos R (2011) Risk in ore reserves and mine planning optimisation: Stochastic models and optimisation for the mining industry, Perth, August 17-19, AusIMM.

  3. Dimitrakopoulos R (2011) Dimitrakopoulos R (2011) Ore reserve risk and mine planning optimization. SME Annual meeting, Denver Co.

  4. Dimitrakopoulos R (2010) Risk in ore reserves and mine planning optimisation: Stochastic models and optimisation for the mining industry, Perth, November 17-19, AusIMM.

  5. Tonkin C, Dimitrakopoulos R, Whittle G (2010) Strategic risk management in mine design: From life-of-mine to global optimisation, Perth, November 22-25, AusIMM.

  6. Dimitrakopoulos R, Batista G, Whittle G (2010) Strategic risk management in mine design: From life-of-mine to global optimization. July 1-4, Johannesburg, South Africa, SAIMM - RCA.

  7. Batista G, Dimitrakopoulos R, Whittle G (2010) Strategic risk management in mine design: From life-of-mine to global optimization. June 1-4, Montreal, Canada.

  8. Dimitrakopoulos R (2010) Ore reserve risk and mine planning optimisation. SME Annual meeting, March, Phoenix, Az.

  9. Campbell C, Dimitrakopoulos R, Whittle G (2009) Strategic risk management in mine design: From life-of-mine to global optimisation, October 13-16, Montreal, SME-COSMO.

  10. Dimitrakopoulos R (2009) Stochastic resource modelling and mine planning optimization: Modern geostatistics and optimization tools for the mining industry. Clausthal University of Technology, Clausthal, Germany, September 7-8.

  11. Dimitrakopoulos R (2009) Ore reserve risk and mine planning optimisation: Stochastic models and optimisation for the mining industry, Perth, March 11-13, AusIMM.

  12. Campbell C, Dimitrakopoulos R, Whittle G (2009) Strategic risk management in mine design: From life-of-mine to global optimisation, March 18–20, Perth. AusIMM.

  13. Dimitrakopoulos R (2008) Risk management for ore reserves and mine planning: Stochastic models and applications for the mining industry, Santiago, December, GEOSTATS 2008 (2 days).

  14. Dimitrakopoulos R, Enrique R (2008) Stochastic mine planning, Graduate course, University of Chile, Santiago, December (1 week).

  15. Dimitrakopoulos R (2008) Ore Reserve Risk and Mine Planning Optimization, Certification program, McGill, Montreal (4 weeks, May - August).

  16. Dimitrakopoulos R (2008) Risk Assessment for Ore Reserves and Mine Planning: Stochastic Simulation Applications for the Mining Industry, SME Annual Meeting, Salt Lake City, Utah, February (1 day).

  17. Dimitrakopoulos R (2008) Modelling geological uncertainty and risk assessment in mine development, Earth Sciences Dept., U of Ottawa, Feb 20 - 21.

  18. Campbell C, Dimitrakopoulos R (2008) Strategic Risk management and applied optimisation and in mine design. AusIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Perth, November (3 days).

  19. Dimitrakopoulos R (2007) Orebody Uncertainty, Risk Assessment and Profitability in Recoverable Reserves, Ore Selection, and Mine Planning. Ouro Preto, MG, Brazil.

  20. Dimitrakopoulos R (2007) Risk Analysis for Ore Reserves and Strategic Mine Planning: Stochastic models and applications. U of Witswatersrand, Johannesbourg, March, Graduate Course (1 week).

  21. Dimitrakopoulos R (2007) Applied risk analysis for ore reserves and mine planning. AusIMM Series on “Strategic Risk Quantification and Management for Ore Reserves and Mine Planning”, Perth, November (3 days).

  22. Whittle D, Dimitrakopoulos R, Campbel C (2007) Strategic Risk management and applied optimisation and in mine design. AusIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Perth, November (3 days).

  23. Dimitrakopoulos R (2007) Applied risk analysis for ore reserves and mine planning. CIM/SME/AusIMM/SAIMM Series on “Strategic Risk Quantification and Management for Ore Reserves and Mine Planning”, Montreal, May (3 days).

  24. Whittle D, Dimitrakopoulos R, Anre M (2007) Strategic Risk management and applied optimisation and in mine design. CIM/SME/AusIMM/SAIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Montreal, May (3 days).

  25. Dimitrakopoulos R (2006) Applied risk analysis in orebody modelling and strategic mine planning, Maptek, Vina del Mar, Chile (4 days).

  26. Dimitrakopoulos R (2006) Advanced Geostatistics, simulations and environmental applications, Lecture, Geoenvironmental MSc Program, Univ. of Athens, Athens.

  27. Dimitrakopoulos R (2006) Orebody uncertainty, risk assessment and profitability in recoverable reserves, ore selection, and mine planning. AusIMM Series on “Strategic Risk Quantification and Management for Ore Reserves and Mine Planning”, Perth, November (3 days).

  28. Whittle D, Dimitrakopoulos R, Ramazan S (2006) Strategic Risk management and applied optimisation and in mine design. AusIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Perth, November (3 days).

  29. Dimitrakopoulos R (2006) Applied risk analysis for ore reserves and mine planning. CIM/SME/AusIMM/SAIMM Series on “Strategic Risk Quantification and Management for Ore Reserves and Mine Planning”, Montreal, May (3 days).

  30. Whittle D, Dimitrakopoulos R (2006) Strategic Risk management and applied optimisation and in mine design. CIM/SME/AusIMM/SAIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Montreal, May (3 days).

  31. Dimitrakopoulos R (2005) Orebody uncertainty, risk assessment and profitability in recoverable reserves, ore selection, and mine planning. AusIMM Series on “Strategic Risk Quantification and Management for Ore Reserves and Mine Planning”, Perth, November (3 days).

  32. Whittle D, Dimitrakopoulos R, Ramazan S (2005) Strategic Risk management and applied optimisation and in mine desig. AusIMM Series on “Strategic Risk Quantification and Management for Ore reserves and Mine Planning”, Perth, November (3 days).