|
NAME |
YEARS |
DEGREE |
THESIS TITLE |
PRESENT POSITION |
|
Conor Meahear (co-D.Avis, CS) |
2006-2011 |
PhD |
“On the direct cut polyhedra and open pit mining” |
Newmont Mining, Denver |
|
Xu Huan (co- S. Manor,ECE) |
2006-2009 |
B.Eng |
“Robust decision making and its applications in machine learning“ |
U of Singapore, Singapore |
|
Arja Jewbali |
2002- 2006 |
PhD |
“Modelling geological uncertainty for stochastic short-term production scheduling in open pit mines” |
RioTinto, Perth; now Newmont, Denver |
|
Jeroen van Eldert |
2010 - 2011 |
MSc, Delft U, Netherlands |
“Stochastic open pit design with a network flow algorithm: application at Escondida Norte, Chile” |
|
|
Francisco Albor Consuegra |
2007-2010 |
MEng |
“Exploring stochastic optimization in open pit mining” |
Arcelor Mittal, Montreal |
|
Lucia Robles |
2007-2009 |
MEng |
“Critical analysis of multi-point statistics methods in stochastic simulation of geology at Fox kimberlite pipe,Ekati, NT“ |
Newmont Mining Co, Peru |
|
Andre Leite |
2006-2008 |
MEng |
“Application of stochastic mine design and optimization methods” |
Vale Inco, Toronto |
|
Louis Archambeault (co- to M Bilodeau) |
2005-2006 |
MEng |
“Application of Markov Decision Processes to Mine Optimization: A Real Options Approach” |
CIBC World Markets, Vancouver |
|
Richard Peattie |
2004- 2007 |
MPhil |
“Future data and recoverable reserve estimation” |
AngloGold Ashanti, RSA |
|
Justin Scott |
2004-2006 |
MPhil |
“Multifractal simulations using analogues: Application at Wyong, NSW” |
Rosh Mining, Queensland |
|
Ron Eggins (co-. P. Forrestal, Xstrata) |
2002- 2006 |
MPhil p/t |
“Advanced verification of resource/reserve estimates and forecasting” |
Xstrata |
|
Volker Osterholt |
2004-2005 |
MPhil |
“Methods for simulating geology” |
BHP Billiton, Perth |
|
Jorg Bernndorf (co- S. Ramazan) |
2003-2005 |
MPhil |
“Large scale stochastic simulations for long term scheduling formulations” |
Washingon Group, Germany |
|
Cory Case |
2010-2011 |
BEng |
”Testing stochastic network flow algorithms” |
GEMCOM |
|
Bernabe Lopez |
2009-2009 |
BEng |
”Modelling of an epithermal gold deposit” |
Undergrad student Mining, Eng., U of Chile |
|
Jeroen van Eldert |
2009 - 2009 |
B.Eng exchange, Delft U, Netherlands |
“Estimation and simulation of a gold deposit” |
MSc, Delft |
|
Tien-Hai Nguyen |
2008-2009 |
Research assistant |
“Testing of the Lersh-Grossman algorithm” |
Research Assistant, Hanoi University, Vietnam |
|
Felipe Aguilera |
2009-2009 |
B.Eng |
“Geostatistical modelling of an epithermal gold deposit” |
Undergraduate, Mining Eng., U Chile |
|
Yang Li |
2008-2008 |
B.Eng |
”Pipage rounding algorithms” |
PhD student, Oxford University, UK |
|
Catherine Chou |
2007-2008 |
B.Eng |
“Resource/Reserve Classification with Simulation” |
MSc Student, Ecole Polytechnique |
|
Obbada (Elijah) |
2007-2008 |
B.Eng |
“Testing Stochastic Optimization in a Copper Mine” |
Mining Engineer, Barrick Gold, Toronto |
|
Amr Mahmoud |
2007-2008 |
B.Eng |
“SIP - Mine Production Scheduling” |
Completed |
|
Nikki Grieco |
2001-2004 |
MPhil |
“Risk analysis of optimal stope design: Incorporating grade uncertainty” |
AMEC, Canada |
|
Marcelo Godoy |
1998-2003 |
PhD |
“The effective management of geological risk in long-term production scheduling of open pit mines” |
Golder Associates, South America |
|
Alexandre Boucher |
2001-2003 |
MPhil |
" Conditional joint simulation of random fields on block-support” |
Assistant Professor, Stanford U. |
|
Luis Martinez |
2000 2001-2003 |
Post-grad Diploma M.Phil |
“Review of methods for long- and short-term production planning”; “Can quantification of geological risk improve open pit mine design?” |
PhD, Queensland University of Technology |
|
Chris Farrelly |
1999-2002 |
MPhil |
“Risk Quantification in ore reserve estimation and open pit mine design” |
Consultant, Brisbane |
|
Sumaira Qureshi |
1997-2002 |
MPhil |
“Comparative study of simulation algorithms in mapping spaces of uncertainty” |
Lecturer-Australian National University |
|
Peter Rolley |
1996-2001 |
MSc (p/t) |
“Geologic uncertainty in the development of an open pit mine: A risk analysis study” |
Manager, Teck Cominco |
|
Matthew Kay (co- P. Fullagar) |
1997-2001 |
MSc |
“Geostatistical integration of conventional and downhole geophysical data in the metalliferous mine environment” |
SunCorp Metway, Brisbane |
|
Margaretha Scott |
1996-2000 |
PhD |
“Valuing Australian state geological surveys: Quantitative analysis for strategic planning” |
Senior Scientist, Qld Dept. Mines & Energy |
|
Ivor Jones |
1996- 2000 |
MSc |
“Indicator kriging at Mt Morgan, Qld” |
Snowden Consulting, Perth |
|
Andrew Richmond |
1996-1998 |
MSc |
“Multi-scale ore texture modeling for mining applications” |
PhD, Imperial College, Golder - Brisbane |
|
J. Felipe Costa |
1994-1998 |
PhD |
“Developments in recoverable reserve estimation and orebody modeling” |
Assoc. Prof. Mining Eng., FU RioGrande do Sul, Brazil |
|
Xiaochin Luo |
1992-1998 |
PhD McGill Uni. |
“Spatiotemporal stochastic models for earth science and engineering applications” |
Mamotech, Montreal |
|
Jackie Alison (co- M. Bilodeau) |
1990-1994 |
PhD McGill Uni. |
“Games in mine economics” |
VP, Harris Investment Management, Toronto |
|
William Cheung (co- F. Ferry, EE, & G. Carayannis) |
1990-1992 |
MEng McGill Uni. |
Inferring surface structure of rock piles from range images” |
Nortel, Hong Kong |
|
Omar Idriss (co- with JE) |
1989-1991 |
MEng McGill Uni. |
“Vibration effects on pickforce sensing” |
|
NAME |
YEARS |
DEGREE |
THESIS TITLE |
PRESENT POSITION |
|
Asif Khan |
2011- |
PhD |
“Global optimization and cut-off grade optimization” |
RA, McGill |
|
Xianglei Wang |
2010- |
PhD |
“High-order Simulations for Categorical Variables” |
RA, McGill |
|
Surendra Kesari |
2010- |
MEng |
“Stochastic optimal cutoff grade policy for mining complexes” |
RA, McGill |
|
Ryan Goodfellow |
2009- |
PhD |
“Stochastic programming for global mine optimization” |
RA, McGill |
|
Luis Montiel |
2009- |
PhD |
“Global Stochastic Mine Optimization with POK” |
RA, McGill |
|
Alexander Marinho |
2011- |
MEng |
”High-order simulation with categorical data" |
RA, McGill |
|
Martha Villalba Matamoros |
2011- |
MEng |
”Stochastic optimization in and mine planning" |
RA, McGill |
|
Wadood Yahaya (co-Psaromiligkos, ECE) |
2011- |
MEng |
”Image reconstruction through spatial cumulants" |
RA, McGill |
|
Maiko Sell |
2011- |
MEng |
”Application of high-order simulation with geophysical data" |
RA, McGill |
|
Putra Mangala (co-Devroye,CS) |
2009- |
MEng |
”Exact Simulation with Markov Models” |
RA, McGill |
|
Victor Vidal |
2008- |
PhD |
“Dynamic Stochastic Cutoff Grades and Pipage Rounding” |
RA, McGill |
|
Iain Farmer |
2010 - 2011 |
BEng |
”Comparative study of conventional vs stochastic open pit mine design" |
RA, McGill |
|
Renaud Senécal (co-Ferland, CS, UMontreal) |
2011 - |
BEng |
”Max flow implementation of Goldberg’s algorithm on SGEMS " |
RA, McGill |
|
NAME |
YEARS |
STATUS |
PROJECT TITLE |
PRESENT POSITION |
|
David Francisco Machuca Mory (U of A) |
2010- |
Postdoc |
“Geostatistics with high-order models and applications” |
Postdoc, McGill University |
|
Amina Lamghari (U de M) |
2009- |
Postdoc |
“Stochastic Programming with Metaheuristics” |
Postdoc, McGill University |
|
M Waqar Asad (Colorado S M) |
2009- |
Postdoc |
“Mine Planning and Optimization” |
Research Associate, McGill |
|
Xiaochun Luo (McGill) |
2011- |
Postdoc |
“Computational Geostatistics” |
Research Associate, McGill |
|
Jongik Byun (Kaist) |
2011- |
Postdoc |
“Partially ordered knapsack" |
Postdoc, McGill |
|
NAME |
YEARS |
STATUS |
PROJECT TITLE |
PRESENT POSITION |
|
Hussein Mustapha |
2007-2010 |
Postdoc |
“High order spatial statistics and modeling” |
|
|
K. Gerald v d Boogaart |
2008-2009 |
Research Associate |
“Statistical Modelling and Data Analysis” |
Full Professor, TU Bergakademie Freiberg, Germany |
|
Snehamoy Chatterjee |
2008-2010 |
Postdoc |
“Mine Planning and Design; Wavelet Simulation” |
Assist. Professor, National Inst of Tech. Rourkela, India |
|
Sabry Abdel Sabour |
2006-2010 |
Research Associate |
“Real Option Valuation and Mine Planning” |
Assist. Professor, Mining Eng, U of Alaska |
|
Mustafa Kumral |
2006-2007 |
Research Associate |
“Mine Planning and Optimization” |
Associate Professor, Inonu University, Turkey |
|
Erwan Gloaguen |
2005-2007 |
Postdoc |
“Soft Data and Multi-point Deposit Simulation” |
Assistant Professor, Inst national de la recherche scientifique |
|
Erkan Topal |
2005-2006 |
Research Associate |
“Multistage Pit Optimisation” |
Head, Mining Engineering Dept., WASM, Australia |
Dr. Alexandre Boucher, Stanford University, USA.
Dr. Alexandra Newman, Colorado School of Mines, USA.
Dr. Alexandre Desbarats, Geological Survey of Canada, Ottawa, Canada.
Prof. Gui Fu, School of Safety Engineering, China Univ. & Technology, Beijing, China.
Mr. Michel Dagbert, GEOSTATS Systems Int., Montreal Canada.
Prof. Michel Bilodeau, Dept. Mining and Metallurgical Engineering, McGill University, Montreal, Canada.
Dr. Graham Bonham-Carter, Geological Survey of Canada, Ottawa, Canada.
Prof. Andre Journel, Stanford University, USA.
Prof J-P, Chiles, Paris School of Mines, France.
Dr. Alexandre Boucher, Stanford University, USA.
Prof. Xavier Emery, University of Chile, Chile
Prof. Enrique Rubio, University of Chile, Chile
Prof. Erkan Topal, Head of Mining Eng, Curtin University –WASM, WA, Australia
Jeff Whittle, Whittle Programming, Melbourne, Australia.
Prof. J. Felipe Costa, Iniveridade Federal Rio Grande do Sol, Brazil.
Jeroen Van Eldert, Mining Engineering, Delft U, The Netherlands
Bernabe Lopez, Mining Engineering Department, U of Chile, Chile
Felipe Aguilera, Mining Engineering Department, U of Chile, Chile
Amisha Maharaja, Petroleum Engineering, Stanford University, USA (at McGill).
Nina Lothian, McGill University, Mining Engineering Program, Montreal, Canada (at UQ).
Louis Archambault, McGill University, Mining Engineering Program, Montreal, Canada (at UQ).
Keith Kenny, McGill University, Mining Engineering Program, Montreal, Canada (at UQ).